Bakersfield to Open New Six-Mile Bike Trail by 2027

A new Friant-Kern Canal path will connect residents to the Kern River Parkway, improving safety for local cyclists.

Updated on Oct. 23, 2026 in Hiking

Bold vector editorial illustration of a bicycle path alongside a canal, connecting urban desert terrain with a bridge crossing.
Bakersfield city officials approved a final bridge crossing, clearing the way for the six-mile Friant-Kern Canal bike trail opening in 2027. AI Illustration. Upload story photo >

Live Poll

Do you believe expanding dedicated bike trails improves safety for cyclists and drivers in your area?

Bakersfield is building a six-mile bike trail along the Friant-Kern Canal to connect northwest city paths to the Kern River Parkway Trail. The city recently secured approval for a crucial railroad crossing that will allow the path to reach completion by late spring 2027.

Why it matters

This infrastructure project aims to improve cyclist safety and visibility by integrating bike travel with major city arteries. The new trail provides residents in northwest Bakersfield with a direct, dedicated connection to the larger Kern River Parkway network.

The city is constructing a 6-mile bike trail along the Friant-Kern Canal as part of a municipal expansion plan. This project connects existing segments to the Kern River Parkway, though the full integration of these paths depends on the final railroad crossing installation.

The details

The project uses the Friant-Kern Canal corridor to create a protected route for cyclists. By securing a bridge crossing between Rosedale and Brimhall-Truxton, planners are bypassing major rail obstacles that previously hindered north-south connectivity. The city has ordered the final bridge fabrication to ensure cyclists can transition safely across the track area without interacting with active rail traffic.

Timeline

  1. Late spring 2027: The city expects the bridge to be in place.

Health Landscape

Urban trail expansions are part of a broader trend to increase physical activity by prioritizing active transportation corridors. The Friant-Kern Canal path extends the connectivity provided by the Kern River Parkway Trail, centralizing recreational access for local residents.

Developing dedicated, protected biking routes reduces the risk of traffic-related injuries for regular commuters and casual cyclists. Residents should monitor future announcements from the city to identify when these new segments become safely accessible for local fitness routines.

The takeaway

Reliable bike trail networks support consistent outdoor exercise habits by providing safer, more accessible routes for daily transit and recreation. Cyclists should stay updated on city progress to take advantage of the new connections once the construction phase concludes.

What happens next

The city will host a grand opening event for the public once the final bridge installation and remaining construction work are finished in late spring 2027.

Further reading

For more information on local outdoor access and safety tips, visit Hiking.

Source note: This article includes information reported by KERO.

Live Poll

Do you believe expanding dedicated bike trails improves safety for cyclists and drivers in your area?